Category Archives: Uncategorized

Bicentennial Bikeway Detours

The CBD BUG has been advised that due to Stage 4 of the Bicentennial Bike upgrade commencing works that detours are now in effect. Please see attached map Bicentennial Bikeway Detour Map

Posted in Uncategorized | Leave a comment

Victoria Bridge Work

The CBD BUG has been advised the spiral ramp will be closed tonight to permit the installation of a replacement section, replacing the previous Humped connection between the spiral and the Bridge proper. The Victoria Bridge Off road path will … Continue reading

Posted in Uncategorized | 1 Comment

Partial Bikeway Closure – Eagle Street Pier Boardwalk

The CBD BUG has been advised by BCC that “The Eagle Street Pier Boardwalk will be partially closed from 8pm to 5am from Monday 20 January for re-coating of the path. To allow users access, that work will be done … Continue reading

Posted in Uncategorized | Tagged | Leave a comment

York’s Hollow Bikeway (Bottom of Victoria Park) night time closure

The CBD BUG has been advised by BCC “A 33KV power cable needs to be placed under and through this area for the Legacy Way project. All work will be undertaken at night and there will be detours around the … Continue reading

Posted in Uncategorized | Tagged | 2 Comments

Riverside Bikeway closure 20/10/13

BCC has informed the CBD BUG that the Riverside bikeway between Forbes & Victoria streets West End will be closed this Sunday the 20th of October. The closure will occur between 6am and 4pm for the Great Brisbane Duck Race. … Continue reading

Posted in Uncategorized | Tagged | Leave a comment

Bikeway Closure – Victoria Bridge Spiral Ramp

The CBD BUG has been advised by Council : “Spiral Ramp – Victoria Bridge to Cultural Centre Boardwalk The Spiral Ramp from the western end of the Victoria Bridge Shared Pathway (upstream side) to the Cultural Centre Boardwalk along the … Continue reading

Posted in Uncategorized | 2 Comments

BT Journalist soon to be riding his own Bike

The CBD BUG congratulates Brisbane Times’ journalist Daniel Nancarrow for his decision to join the increasing numbers of proud bike owners in riding to work. It is disappointing it took failures by citycycle to prompt it! http://www.brisbanetimes.com.au/queensland/its-time-to-give-up-on-citycycle-20130719-2q9en.html

Posted in Uncategorized | Leave a comment

Toowong to Indooroopilly Bikeway Corridor Study

The BCC is currently undertaking a corridor study for bicycle access between Toowong and Indooroopilly and are asking for the public’s feedback. For more information please see link below. Please help BCC get it right http://www.brisbane.qld.gov.au/traffic-transport/roads-infrastructure-bikeways/bikeway-and-pathway-projects/toowong-indooroopilly-commuter-bikeway-corridor/index.htm

Posted in Uncategorized | Tagged | 1 Comment

CBD BUG Jersey — new orders!

A new run of the CBD BUG jersey is taking place, and we are taking orders! The jerseys are available in a variety of sizes in both men’s and women’s versions. They cost $100, and come in a choice of … Continue reading

Posted in Uncategorized | Tagged | Leave a comment

Bike workshop for overseas aid

SkillsTech Australia in association with Rotary Redcliffe is conducting a Bicycle restore, repair, make roadworthy day at the Bracken Ridge campus Bicycle workshop. The aim of the workshop is to restore back to road worthiness, the donated bicycles stored at … Continue reading

Posted in Uncategorized | 1 Comment