Victoria Bridge Work

  1. The CBD BUG has been advised the spiral ramp will be closed tonight to permit the installation of a replacement section, replacing the previous Humped connection between the spiral and the Bridge proper. The Victoria Bridge Off road path will remain open but Traffic controllers will be in place.
This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Victoria Bridge Work

  1. John G says:

    I am wondering if you have a Twitter account feed for these updates? I cycle to and from the CBD and would like to follow you. thanks, John.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>