Bikeway Closure – Victoria Bridge Spiral Ramp

The CBD BUG has been advised by Council :
“Spiral Ramp – Victoria Bridge to Cultural Centre Boardwalk
The Spiral Ramp from the western end of the Victoria Bridge Shared Pathway (upstream side) to the Cultural Centre Boardwalk along the river will be closed from Monday 07 October 2013 for complete replacement of the surface. The work is scheduled to take three weeks, subject to the condition of the supporting structure and weather during the closure period.
Cyclists and pedestrians will be directed to a detour through the Cultural Centre precinct via steps and a ramp to the boardwalk. Signs will be placed along the detour at the top and bottom of the area. Traffic Controllers will be in locations to assist during the day.
Cyclists and pedestrians are advised to exercise caution when using the detour.”

This entry was posted in Uncategorized. Bookmark the permalink.

2 Responses to Bikeway Closure – Victoria Bridge Spiral Ramp

  1. Paul myers says:

    Hello all

    The spiral bike ramp surface replacement is complete.. Unfortunatley the suface is rubbish.. The new surface is very slippery and once it gets a wet it has no traction.. It is only a matter of time before someone comes off their bike

    Bike riders beware.. I have reported this to Council and DMR.. they are investigating

    Regards

  2. Paul myers says:

    Bike Ramp is now closed again.. Re-Resurfacing is in progress.. lets try again

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>