Monthly Archives: January 2012

Annual General Meeting

This month’s meeting is the Annual General Meeting, to be held at 12.30pm this Wednesday, 25 January in the usual tiered theatrette in the BCC library on the ground floor of Brisbane Square, 266 George Street.

Posted in Uncategorized | Tagged , | Leave a comment

Call to action: upcoming elections

Local government elections will be held in Queensland on 31 March 2012 while the last possible date for the next Queensland State Election is 16 June 2012. Election campaigns are the prime opportunity for cyclists to obtain some policy announcements … Continue reading

Posted in Uncategorized | Tagged , , | 2 Comments

King tides this weekend

King tides this weekend will mean some bikeways in the city and suburbs may be underwater. The highest tide will be 2.55 m at the Brisbane Bar (near the mouth of the river) at 9:39 am Monday, which should mean … Continue reading

Posted in Uncategorized | Tagged , | Leave a comment

City Reach Boardwalk — Fence Replacement

BCC advises that replacement of the final sections of the fencing along the City Reach Boardwalk will commence on Monday 23 January 2012. The work will be done in stages along the boardwalk commencing at the Eagle Street Pier ramp … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment

Centenary Motorway cycle closure

The 10 km section of the Centenary Highway between Garden Road, Richlands and Springfield Parkway will be closed to cyclists during next stage of construction of the Darra to Springfield railway line. The closure affects only the highway itself, not … Continue reading

Posted in Uncategorized | Tagged , , , , , | Leave a comment

Call for nominations: 2012 co-convenor positions

In accordance with CBD BUG’s constitution, the Annual General Meeting will be held later this month: Date: Wednesday, 25 January 2012 Time: 12:30pm – 1:30pm Location: Brisbane Square tiered theatrette, ground floor, 266 George St At the meeting up to … Continue reading

Posted in Uncategorized | Tagged , | Leave a comment

Jack Pesch Bridge bikeway partial closure

BCC advises that preliminary work for upgrading the sewer under the bikeway from Lambert Road, Indooroopilly to the Jack Pesch Bridge will commence next week — Wednesday 11th and Friday 13th of January. This will involve the construction of a … Continue reading

Posted in Uncategorized | Tagged , , , | Leave a comment